2014/05/03 (S) Ham It Up

Today started with breakfast out and felt like we were finally starting to get back into the flow.  We drove to South Lyon for the Saturday morning breakfast gathering of our South Lyon Area Amateur Radio Club, as we do almost every Saturday morning when we at the house.  Steve (N8AR) gave me a lead on someone who might be willing to build our pole barn.  After breakfast we returned home and I walked Linda through the project I discussed yesterday with Steve for redoing the rear basement walkout retaining walls, drainage, and yard grading.

I worked on our blog and Linda worked on lunch preparations while we awaited the arrival of our daughter and son-in-law.  They have had Linda’s Honda Civic Hybrid since December and were returning it, so they drove two cars.  Linda got to visit with them in late February / early March, but I had not seen them since mid December.  We had a nice lunch of mixed greens salad and vegan Sloppy Joe’s with sweet gherkin pickles on the side.  Fresh strawberries and carrot cake cookies provided a sweet ending to the meal.  We had a nice visit.

Steve from Village Landscaping Development stopped by with a brochure, business card, and the project proposal written up on a more official estimating form.  We will take a few days to think about, but it’s a very good proposal and I am 99% certain we will hire him to do this work.  It would be nice to get it done in late May to early June, between The SKP Escapade and the GLAMARAMA rallies, but it may not be dry enough by then.  If not, it will have to wait until early July after we return from the installation ceremonies for Linda’s sister who is assuming one of the top leadership positions in the St. Louis Province of the Congregation (Sisters) of St. Joseph.

A little later Phil Jarrel, from Best Precision Grading, came by to take a second look at the site preparation and grading work for the pole barn.  We walked the site and agreed that I could/should change the orientation of the building just a bit from where it is currently staked.  We also discussed how to make sure the barn was located behind the front line of the house and talked through the permitting and construction process.  He did not have any builders to recommend, but he did recommend a concrete contractor for the pit and floor.

We did quite a few construction projects at the previous house over the years but the pole barn involves elements that are new to me, and I now have to deal with a Township for a land use permit and the County for building and grading permits.  I am fairly set on the size, location, and basic design/materials, but we not have settled on a builder or materials supplier.  Consequently, we still do not have an accurate total cost estimate.  Until everything is in place, and the cost is known, nothing can move forward.  Meanwhile, the days keep flipping over on the calendar.

 

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.