Tag Archives: roof shingles

2015/06/15 (M) Cover Up

Linda was originally scheduled to go into the bakery today but it got rescheduled to tomorrow so we did not have to be up by any certain time other than to be ready for the delivery of our new roof shingles.  Apex Roofing is scheduled to put a new roof on our house this week, weather permitting, and assuming they can finish up jobs they had scheduled for last week when it rained so much.

The truck from Wimsatt Materials in Waterford showed up at 8 AM with our shingles but they were unable to deliver them.  They brought them on a boom truck that was too tall to fit under the phone lines across our driveway and there was nowhere else they could position the truck that would allow them to operate the boon.  They were on the phone with their dispatcher and I called Pat Davidson at Apex roofing to let him know what was going on.  The decision was that they would be back this afternoon with a conveyor truck which would fit under the wires and be able to get the bundles up to the roof.  Pat called back to let me know they would be starting in the morning around 7:30 AM.

Later in the day someone showed up in an Apex van with a large enclosed trailer.  We moved our cars and he backed it up in front of our single garage door.  Wimsatt did not return with shingles so they will presumably deliver them first thing tomorrow morning.  They will need to back into the driveway and position the truck in front of our double garage door but that is also where Apex plans to put their debris trailer.  The guy in the van also made it sound like there would be at least six cars/trucks here needing someplace to park.  It should be an interesting morning, especially given the overnight weather forecast which includes drenching rains and possible severe weather and flooding.  The forecast for the daylight hours, however, looks OK.

After the Wimsatt truck left we finished the last batch of granola for breakfast and then got busy with our chores and projects.  Linda spent part of the day at her desk working on the financials for our local ham radio club (SLAARC).  She also tried to contact PayPal to opt out of their upcoming RoboCall campaign but was not able to get through to a real person.

I settled into my office for the morning, dealing with e-mail but focusing on editing blog posts for the last seven days.  Kate got in touch with me to see if we wanted to see The Bikinis musical production at the Meadow Brooke Theatre this week.  Wednesday through Sunday is the final run.  She also forwarded an invitation to a former colleague’s retirement gathering in a couple of weeks.

We have an RV Critter Guard that seals around our 50 A electrical cord and water hose to keep “critters” from entering the coach via that access hole.  We lost our original foam insert when I forgot to remove it from the cable entrance hole in the floor of the bus utility bay and it fell (blew) out while we were driving.  I checked the RV Critter Guard website and my exact products were not listed.  I measured our existing tongue and groove plate and then contacted the company via their contact form and explained what I needed.  I got an e-mail back indicating that my product was custom made and asking me for one additional dimension from the plastic plate.  I got that measurement and e-mailed it to them and indicated that I wanted another plastic plate and two spilt foam inserts.  I expect to receive an e-mail tomorrow with the price.  Once I have that I will call them to place the order.

I have tried several times in the last two years to order products from EZ Connector but they have always had another question for me that required me to go check something and I have never managed to close the loop with them.  I’ve been on a roll the last couple of weeks and decided that today was the day to get this done.  The company is in California, so I called them during the afternoon (my time).  The woman I spoke to on the phone gave me some good information but suggested I e-mail Joe with my requirements.  Joe e-mailed me back and answered several questions but had another one for me.  I responded to that question and went on to something else while I await the prices.  Once I have the pricing I will have to call them and finalize the order.

I exchanged e-mails with Josh from Coach Supply Direct and got a series of revised quotes from him for our new RV furniture and window shades.  What I really need are the drawings that show the exact dimensions of each piece including the size of the base and the location of the pivot (swivel) point.  Apparently he is having difficulty getting these from Flexsteel.  I would also like to have these for the Lambright Comfort Chairs but we took our own measurements at Bradd and Hall.  The whole process of getting furniture is getting very frustrating.  I need to contact Mike at Suburban Seating regarding the ISRI 6860 and pick a day to drive to ISRI USA in Galesburg to look at fabrics.  While I am at it I should probably get a price from Prevost.

I finally got back to work in the bus this afternoon.  I shut off the auxiliary air compressor, closed the valve on the air manifold that supplies air to the toilet and other house accessories, and drained the water separator.  I then investigated what will be required to remove the toilet.

There is a shut off valve on the water line behind the toilet so I closed that.  The water line is attached to the toilet mechanism with a plastic connector with two wings and looked like I could undo it by hand.  The air line looked equally easy to disconnect but the drain looked a bit trickier.  It goes out the back of the toilet rather than through the floor.  There is a metal sleeve with band clamps at each end that connects the discharge pipe to the drain line.  Fortunately the band clamp screws are accessible.

The toilet is screwed to the floor with four Philips head screws.  The centers of the screw heads are threaded and there are plastic caps with posts that screw down into the mounting screws to conceal them.  With the water, air, and waste lines disconnected once I unscrew the base the toilet should slide forward and then we may have to lift it to get clear of the water line.  The trick to getting it back in will be to get the four mounting screws back in the exact same holes.

The humidity outside was near 100% and I did not feel like running the bus air conditioners so I did not remove the toilet today.  I need to get it out, however, to remove the last few pieces of ceramic tile from the bathroom floor.  Once it is out it will have to stay out until the new floor is installed.

I tried pulling on one of the window latch knobs on the fixed window across from the kitchen counter and was surprised by easily it moved the latch.  I did not pull it far enough to unlatch it but it appears that getting the window unlatched will be relatively easy.  Getting the frame open without damaging the frame seal, and getting it closed again so it is weather tight, may be slightly more challenging.

I used a chisel to try removing the thinset and mastic that was adhered to the plywood subfloor.  It came off better than I thought it would but it was a slow process.  In addition to being humid in the coach it was very warm as I have had to leave the roof vents closed with the fans off due to the rainy weather.  I removed enough thinset, however, to convince me that it is worth renting the power floor scraper from the Home Depot in Howell for a day and see how it works.

Late afternoon Linda worked in the kitchen making another batch of her fabulous granola and a black beans and rice dish for dinner.  She soaked two Hatch chilies, two Ancho chilies, and four Pequin chilies and used them in the bean dish.  I had a call from Pat Lintner before dinner to let me know that they took their Prevost to McMillers in Nappanee and were very pleased with work and the price.

I thought about driving to the Lowe’s in Howell after dinner to order the new Frigidaire refrigerator for the bus but it got too late to go.  We have decided to have it delivered to Chuck Spera’s shop in Novi.  We can pull it inside and he has a forklift, so hopefully that works out OK.

We were both tired and headed off to bed at 10 PM.  The weather radar showed a band of more intense rain setting up to our southwest and taking aim at us.  Linda fell asleep quickly but I was still up writing when the rains started around 11:15 PM.  We had the house closed up with the air conditioner running and a small fan for air movement so the sounds of the weather are not as noticeable as when we have the windows and doorwalls open.  I checked the radar again on Wundermap and it looked like we might be in for a long stretch of persistent rain unless the line drifted south just enough to miss us.  The strongest weather in the region stretched from Ft. Wayne, Indiana WSW to just south of Logansport, Indiana but there were lots of pockets of yellow with some orange on the screen over all of the southern half of Michigan’s lower peninsula and the northern half of Indiana.  It looked like it might be another restless night.

 

2015/06/10 (W) Ron and Mary

Same routine as yesterday; up at 7 AM, open up the house, feed the cats, clean the litter tray, start a load of laundry, make the coffee, and drink the coffee while using our iPads.

Our daughter’s 34th birthday is tomorrow but she is flying to Las Vegas today to meet up with her husband who is there on a company outing.  We will celebrate her birthday when they get back, perhaps in conjunction with Father’s Day and Linda’s birthday, which is at the end of the month.

Linda left at 9 AM for Brighton Honda to have the 12 V battery in her car checked.  The battery light came on the other day so we thought it might need to be replaced.  Around 9:20 AM I heard thunder and a short time later we had a brief, heavy downpour.  Linda called at the same time and said the battery tested OK.  The problem could be the alternator, of course, but presumably the dealer service people know that and checked for that.  If not, we will likely be back there sooner rather than later.

Linda headed on to Meijer’s to do the grocery shopping.  Today was trash pickup day so I took the trash can to the street.  After meeting with Brad from Chuck It Junk Removal the other day we decided we would rent their trailer for 5 days.  For the same price as having them physically handle 1/3 of a truck of junk (5 cu. yd.) we can get rid of a full truck of junk (15 cu. yd.) by loading it ourselves.  Deal.

I got a call from Phil Jarrell regarding my request for pricing to dig a foundation hole for a ham radio tower foundation.  It was a useful conversation in that I had not previously realized that I will need a concrete contractor in addition to the concrete supplier.  The only thing the concrete supplier will do is show up with a cement mixer truck and dump the concrete where they are instructed to.  The concrete contractor will actually place rebar, build forms, provide carts or a pumper, and get the concrete from the truck to the hole.  Phil recommended Mike Fearer of Bid-Rite Concrete as a good guy who would work with me to get this done.

I talked with Chuck about getting a key to his shop so we could have the new refrigerator delivered there and have the old one picked up without having to trouble him to be there.  He agreed and suggested that we contact the guy down the street about removing the old windshield and installing the new one as part of the refrigerator swap.

Rather than dig into our bus interior remodeling project I have used the last couple of days to finalize decisions about various products and order them.  One of the things I have wanted/needed for a while is a cable entrance box that will allow me to route transmission lines and control cables into the basement from outside.  I talked to Chris Perri, KF7P, at the Dayton Hamvention last month and decided that I liked his custom fabricated cable entry boxes.  I got his business card at the Hamvention and exchanged a couple of e-mails with him this week.  I decided this morning how I want the box initially configured and e-mailed my specs to Chris.  I would like to run the cabling for the cell phone booster through this box so I needed to get it on order.  Speaking of which, the cell phone booster system arrived today via UPS so I am feeling more comfortable that all of the stuff I am ordering will actually get delivered to our house.

Wednesday’s and Fridays are when Recycle Livingston is open and the Wednesday hours are 11 AM to 5:30 PM.  We had my car loaded up with recyclables and Linda drove over after lunch to drop them off.  When she got back she made a batch of her yummy granola and I got a couple more loads of laundry done while continuing to work at my computer.

After doing my alternate tile layout for the bus floor yesterday I decided that I liked the way it looked better than the original ad that it would not involve any more cutting than the row/column layout.  I also felt confident that I had an accurate enough tile count to go ahead and order the tiles.  I drove to the Shell station to fill my tank and then drove to Lynch Carpet in Howell.  I ordered 12 boxes of the 16″ x 16″ Armstrong Alterna Luxury Vinyl Tile in the La Plata Creme Fresh pattern, and a gallon each of the vinyl adhesive and Glacier vinyl grout.  There are 14 tiles per box (24.89 sq. ft.) for a total of 168 tiles (just under 300 sq. ft.).  The inside floor area of the bus is around 300 sq. ft. before subtracting out walls and cabinets but we will be using some of the tiles on vertical surfaces in the entry stairwell and cockpit and around the box that supports the bed platform.  My estimate is that I will have 10 extra tiles.  The guy at Lynch Carpet suggested that I use a scrap piece of tile as a spacer when installing the tiles but I may use the little plastic “X” pieces designed for this purpose.

From Lynch Carpet I drove to Lowe’s in Howell to see if they had a different portable air compressor that might be more appropriate than the 6 gallon Porter Cable we just bought.  The Porter-Cable air compressor has a maximum regulated pressure of 150 PSI but that is also the maximum tank pressure.  I will have to test it on one of the front bus tires to determine if it will get the job done and if not I will return it.

The guy at Lynch Carpet also suggested that I rent a handheld grinder from Abe’s or A-1 Rental, both in Howell.  Abe’s did not have any grinders of any kind and A-1 was closed on Wednesdays.  The gal at Abe’s suggested the tool rental service at the Howell Home Depot, so I stopped there.  They also did not have a handheld grinder but they did have a floor model concrete grinder.  It was so heavy that I doubt if we could have gotten it into the bus and it was too big to maneuver in the tight spaces where I need to work.  They did have a lighter/smaller floor stripper and I may give that a try before I resort to grinding off the thinset with an angle grinder and diamond impregnated wheel and/or a belt sander with a very aggressive belt.

Pat Davidson called from Apex Roofing while I was out so I called him back.  They will be able to start on our roof next week Monday or Tuesday and will deliver the shingles on Friday this week.  I confirmed that we wanted two of the 14″ light tunnels for the living room.  I also indicated that I had scrapped the idea of building a dormer or installing a roof hatch as I simply did not get this taken care of in time.

Linda had closed up the house and turned on the air-conditioning while I was out.  It was pulling moisture out of the air but would not bring the air temperature lower than 78 degrees.  Not good.  This will be our third summer in this house and we have not used the air-conditioning very much.  The first summer we were gone for most of June, all of July, and a few days in August.  We had the unit serviced last year and thought it was working OK but perhaps did not really use it after that.  We did install filters in the return air grills so perhaps they are restricting the airflow too much.  It is also possible that it needs refrigerant.  I will have to check our records from last year and then call TOMTEK to arrange to have it serviced again.

Linda’s brother, Ron, and his wife, Mary, arrived early this evening.  They are on their way to northwest Illinois for a week-long organized bicycle ride.  They have to be there on Saturday and will be spending the next three nights at our house.  Visits from them are usually not more than once a year but we really enjoy their company when they are here.

For dinner Linda made a nice green salad and then made whole wheat angel hair pasta with onions, garlic, and mushrooms lightly sautéed in olive oil.  Ron does not imbibe but Linda, Mary, and I had a glass (or two) of Moscato.  We moved to the deck after dinner and had fresh strawberries for dessert.  It cooled off as darkness set in and we eventually moved back inside.  The other three were in the kitchen and I was sitting on the sofa when Juniper suddenly caught a mouse in the middle of the living room, or at least that is where I noticed that she had it.  She took it downstairs and I got her to drop it in the bathroom sink but I was unable to get it into a container to take it outside and it escaped into my office.  I closed the doors but I have no doubt it can go wherever it wants in the house from there.  When I returned upstairs we chatted until 11 PM and then all turned in for the evening.

 

2014/07/26 (S) Climbing Ladders

We did not go to our usual ham radio breakfast in South Lyon today so I could get an earlier start on the construction work in the garage.  Before I even got started I got sidetracked by a small rain gutter project which led to further gutter projects.

I bought a downspout elbow yesterday and wanted to get it installed before the next rains, which are forecast for tomorrow at 20% in the early morning riding steadily to 90% by 6 PM.  The elbow is a replacement for a short straight downspout section that feeds water from the end of one gutter into a slightly lower gutter that is perpendicular to the first.  The second gutter has the main downspout at one end.  Rather than dumping water straight down into the lower gutter, the elbow will direct it towards the lower gutter drain hole and away from the house.  A picture would make this much clearer, but I did not take one.

While I was installing the elbow I noticed that both gutters had a lot of “stuff” in them and the wire mesh drain hole grates were mostly clogged.  I cleaned all of the gutters last year, although I do not remember exactly when.  I expect a certain amount of organic material to accumulate in the gutters—the house is surrounded by trees after all—but I was surprised by the amount of granular material that had washed off of the shingles.  There was a lot of granular material last year, which I assumed had taken many seasons to accumulate, and I had flushed all of it out of the gutters with a hose.

The guy who inspected the house when we bought it said the roof was “serviceable” without being much more specific.  I suspect it is approaching the end of its useful life, but is not a project we can take on this year.  We have a ranch house with a low pitched roof, probably not more than 4-in-12.  It would take me several weeks to roof it myself, but it’s something I am (still) capable of doing.  Perhaps next summer, after we build the barn.

Given the condition of these two gutters I decided to check/clean all of them.  In the process I found that the gutter on the front of the house had three mounting screws loose at the west end.  I tightened them up, completing my unplanned roof tasks for the day.

There are several interesting things about “small construction projects.”  One is that they seem small because you can conceptualize the outcome and visualize all of the major steps quickly and easily.  Another is that you assume they aren’t going to cost very much; they are, after all, small projects.  Having been educated and worked as an engineer at one point in my life I tend to design things rather than jump right into the building phase.  The design phase is where I usually get my first reality check as I start to consider all of the details of the project that I was not able to quickly and easily visualize.  The next reality check comes when I am finally ready to build, which means cutting and fastening wood, only to realize that I have many days of other tasks I must complete first.  The tricky part of construction is that stuff has to be done in a certain (correct) order.  If not, you end up having to deconstruct something and then reconstruct it, or engineer an entirely different solution which takes even longer and costs even more than what you planned to do in the first place.

So even though I worked all day I did not build the platform.  Here’s what I did instead:  removed some drywall to expose a wire that was a little too short to get the sheathing into the new sub-panel; installed an outlet box and duplex outlet using the old wire and ran a new wire to the panel; filled out the panel with circuit breakers I will eventually need for new or rewired circuits; patched holes in drywall; cut and installed two studs in the north wall to provide 16″ on center spacing for new drywall; bored holes through the new studs for an old wire; installed a switch near the rear garage door fed from the old wire; ran a new wire for a new outside light; went to Lowe’s and purchased a 36″ exterior grade door (steel), a fold-down ladder for the garage attic, an exterior LED light fixture, and a light fixture for the new utility closet; enlarged the garage attic access opening from 22.5″ x 45″ to 22.5″ x 54″; read and pondered the installation instructions for the fold-down ladder; and decided to call it a night.

Somewhere in all of that we had orange/grapefruit juice, Teeko’s Sweet Seattle Dreams coffee (a blend that Jeff does just for us) and Linda’s homemade granola for breakfast; tofu hot dogs for lunch with sweet cherries, and; vegan Pad Thai for dinner that Linda made from scratch.  The Pad Thai was a complicated dish but Linda’s efforts really paid off; it was outstanding.

By the time I showered, worked on this post, and caught up on some blogs I follow it was time for bed.  I was tired but, having exerted myself physically and mentally and accomplished tangible things, it was a good kind of tired.  I no longer climb corporate ladders.  Today I was up and down real ones.

 

2013_09_13 (Fri) Bakery Business, WordPress, And Gutters

Linda left early to drive to the bakery where she put in a long day.  I worked on the CEPI ATR project for a while in the morning.  The mail came around noon and contained the written proposal package for the bus barn from Morton Buildings.  We also received a box from Bus Conversions Magazine containing multiple copies of the issues in which I have had articles published this year (Feb, Mar, May, and July).  We have been distributing sample copies to potential subscribers as we travel to try and help the magazine build its subscriber base.

At 1 PM I met with Mike (W8XH) from SLAARC to work on a new website prototype using WordPress.  On Monday we had been unable to complete the installation of WordPress at Larry’s for lack of the necessary login information, but Mike had obtained that from another club member during the week.  Finishing the installation was more complicated than we anticipated and we ended up on the phone with Larry (K8UT) most of the time.  Our original goal was to investigate themes and plugins but we worked on installation and configuration instead, including figuring out how to set up subdomains through GoDaddy; first things first, after all.

By mid-late afternoon I was back home, the weather was pleasant, and I finally had time to investigate the gutters.  It came as no surprise that the downspouts were all completely clogged.  What did surprise me was the amount of fine gravel in the gutters.  This was material that had washed loose from the surface of the shingles over time and accumulated along the bottom of the gutters to a depth of 1/4 to 1/2 inch in places.  I got out the 8 foot step ladder and the long hose and spray head, switched the outside faucets to direct well water (unfiltered and untreated) and spent a couple of hours on the roof hosing out the gutters and downspouts.

This was only the second time I had been on the roof, and the first time I had inspected the entire surface.  The inspector had dubbed the roof “serviceable” during the purchase inspection, meaning that it probably did not need to be replaced immediately.  My assessment was “marginally serviceable”, meaning that it will probably have to be re-shingled next summer.  It is a relatively low pitch roof, roughly 4-in-12, so I may redo it myself.  I’ve done this work before, and although I was much younger then, I am actually in better shape now.  The key will be getting the shingles delivered to the roof rather that to the driveway.  The bonus to being on the roof was that the views were nice and I had a much better Verizon 4G/LTE signal than I do in the house, so there is still the possibility that I can get a usable signal into the house using some sort of signal booster system.

By the time Linda fought her way home through Friday evening rush hour traffic she was tired and did not feel like cooking.  It was also obvious that we would not be ready to leave for Twelve Mile, Indiana by noon the next day.  We quickly decided to delay our departure until Sunday and, relieved of that pressure, headed off to LaMarsa in Brighton for dinner.  The LaMarsa in Farmington Hills was a favorite of ours before we moved, and the one in Brighton is equally good.  Our favorite dish is Koshary, an Egyptian street food made with rice, legumes, two different pastas, fried onions, pickled beets, and a spicy sauce.  It comes with a salad with a lovely Middle Eastern vinaigrette dressing.  Dinner always comes with fresh pocket pita breads and garlic spread and the whole meal is vegan, served in a nice setting by wonderful wait staff.