Tag Archives: road construction delay

2015/07/21 (T) A Long Day

I was awake at 6 AM, and up shortly thereafter, even though I did not set an alarm.  I packed a change of clothes and a few toiletries and then gathered up my cell phone and iPad chargers, my iPad, and my checkbook.  I loaded the desk/pantry drawings and travel bag into my car and then did a temporary installation of the weBoost cellular booster.  I put the outside magnetic base antenna in the center of the roof and experimented with the placement of the inside antenna, eventually setting it above the passenger side sun visor facing down.  I backed out of the driveway at 7:05 AM and headed for Indiana.

I took Hacker to Golf Club to Latson with some thought of stopping at Teeko’s for coffee but decided to get some miles behind me first and proceeded to I-96 westbound towards Lansing.  I should have looked up the frequency for the Lansing area repeater, where Don runs a net Monday through Friday from 7 AM until at least 11 AM, but I didn’t think of that ahead of time.  I would also have had to figure out how to switch Mike’s Icom IC-2820H radio from memory mode to VFO mode.  Eventually I will, but not today.  Today was not about ham radio, it was about bus projects.

I took the Lansing Road cutoff to I-69 south and about 20 miles later took the Lansing Road exit at Charlotte.  I stopped at the Biggby’s Coffee not far from the highway and resumed my trip around 8:30 AM.  When Linda and I drove to Edwardsburg, Michigan to visit Coach Supply Direct on July 1st we discovered that M-60 was closed at Minden (between I-69 and US-131) and had to take a long detour.  Rather than risk having that happen again I headed west on I-94.  I had been playing with the cell phone booster but unplugged it and plugged in the Garmin 465T GPS instead.  I eventually saw that M-40 came all the way north to I-94 and decided to take it instead of US-131.

I had never been on this stretch of M-40.  The road was a good 2-lane at 55 MPH except going through small towns.  I drove through miles and miles of vineyards and eventually got to the charming (looking) little town of Marcellus where I discovered a large Welch’s plant.  I knew that a lot of the grapes grown in southwest Michigan ended up as Welch’s grape juice but I did not know where their processing plants were located.  Now I know where they have at least one.

When I reached the intersection with M-60 in Jones I stopped at the Shell station for fuel.  Regular unleaded was $2.52 per gallon which was better than I had seen so far during the trip.  Instead of continuing down M-40 to US-12 I put the address for Coach Supply Direct into my GPS and headed west on M-60 towards Cassopolis.  The GPS had me bypass Cassopolis by heading south on Calvin Center Road to Brownsville Road and then west to M-62 where I headed south towards Edwardsburg.

When I arrived at Coach Supply Direct it was locked up with no sign of Josh.  I called his 800 number and he answered, which I appreciated.  He was in western Pennsylvania heading home from a customer service call and said he could meet me at the shop after 4 PM.  We agreed that I would call him when I had a clearer picture of what time I could get back to his shop.

I left Edwardsburg and drove back on US-12 to Cassopolis Road which merges briefly with Old-102 and then becomes IN-19 (SR-19) in Indiana.  I stopped at Factory RV Surplus in Elkhart, which is on SR-19, to buy a special two-piece bracket for mounting the edge of a table to a wall.  I saw it on their website and luckily they had it in the store as well.

I proceeded south on SR-19 to US-20, went west to US-31, and took that south to the SR-25 exit at Rochester.  From there it was 22 miles to Logansport and a few more blocks to Jarel Beatty Cabinetry.  Jarel is a cabinet maker and a mutual friend of Butch Williams.  I have been talking to Jarel about the custom desk we wanted for the bus for several years and, more recently, about the pull-out pantry and HVAC duct and wiring chase cover.  The purpose of my visit was to deliver the design drawings for the desk and pantry and go over them with Jarel.  I got there around 1:20 PM and left around 5:50 PM.  After discussing the projects at length we agreed that I would change the design of the pantry so I did not leave those drawings with Jarel.  The Fulterer pantry slide had been delivered to Jarel so I took that with me as it turned out to be too wide for this project.

I set my GPS destination for Edwardsburg and it indicated I would arrive around 7:45 PM.  I called Josh to see if that would work for him and he said it would.  I headed north on SR-25 and then called Butch to let him know that I would not be able to stop and visit or spend the night.  That was probably just as well as he was in the emergency room when I called.  He had nicked his thumb in his table saw and was having it tended to.  I stopped at the Kroger in Rochester to buy some snacks for dinner and got a return call from Butch.

The drive to Edwardsburg was pleasant and took me on some more roads I had not driven before.  US-31 north to US-20 east was familiar territory but I exited at Elm Street (US-331 north) which bypassed the west side of Mishawaka and eventually took me up through Granger and onto M-62 in Michigan.  A few miles later I was at Coach Supply Direct in Edwardsburg where Josh was waiting for me.

I returned the Lambright Comfort Chair fabric samples and the MCD shade material samples (the reason for my visit) and we chatted for about 45 minutes.  Our new MCD shades had already arrived but I asked Josh to hang on to them.  We tentatively agreed that we would bring the coach to his shop on Monday September 14 to have the new chairs and shades installed.  The GLCC Surplus and Salvage Rally starts on Wednesday the 16th in Elkhart and Josh offered to let us park at his shop the evenings of the 14th and 15th with 30A electric.

I left around 8:30 PM and started for home.  Again, the initial route was familiar as I took US-12 east to M-40 north, to M-60 and stopped at the Shell station in Jones for the second time today.  I then travelled east on M-60 to Three Rivers where I picked up US-131 northbound.  Rather than continue east on M-60, which I presumed was still closed at Minden, I stayed on US-131 all the way to I-94 between Kalamazoo and Battle Creek.  On I-94 east I encountered a major traffic jam due to construction.  The highway was down to one lane and traffic was barely moving as people merged down and then gawked as they went past the very busy construction site.

The rest of the drive was uneventful and familiar as I left I-94 for I-69 north, stopped at the McDonald’s in Charlotte for coffee, and got back on I-69.  I took the Lansing Road cutoff to I-96 and rolled along eastbound to the M-59 exit on the far west edge of Howell.  Eleven miles on M-59 put me at Hacker Road and a few miles later I pulled into the driveway.  It was just after midnight when I arrived, about 17 hours from when I left, and I had put over 550 miles on the car.  I unloaded a few things from the car and then went straight to bed.