Tag Archives: floor scrapper (rented)

2015/06/17 (W) Bakery Scraper

Linda was up at 5:45 AM and out the door by 6:15 AM to beat the morning rush hour traffic headed into the northwest corner of the Detroit metroplex.  I got up about an hour later, tended to my morning cat chores, made coffee, had some granola for breakfast, gathered up the trash, and took the big trash can to the street.

The Apex roofing crew started showing up just before 8 AM.  After everything was squared away with Apex I went to The Home Depot in Howell to rent the small power floor scraper.  The scraper took some of the thinset off but was not as effective as I had hoped it would be.  The tool is designed for stripping linoleum floors, so I had no reason to complain that it did not do what I needed it to do.  I returned it within four hours and paid the 4-hour rental fee rather than the day (24-hour) fee.  The guy in the tool rental department suggested I try a different machine which they had not mentioned to me previously.  It was a Makita 11 pound power chisel.  I rented it with three chisels.

The roofers were at the point where they needed to install the two Velux Sun Tunnel skylights in the roof of the living room.  I showed them where I wanted them installed, if possible, and they tarped off the furniture and floor in the living room.  Apex is very good about protecting the yard from damage and capturing the mess that is associated with a roof project.  That same care and attention carried over to the inside work, which I appreciated.

Our bus looking forward from the the hallway by the refrigerator and pantry.

Our bus looking forward from the the hallway by the refrigerator and pantry.

After a break for lunch I spent most of the afternoon using the power chisel to strip the area of the floor in the bus where the ceramic tile was installed.  I was not able to strip it down to the plywood subfloor, but I was able to knock down most of the ridges of thinset and adhesive that remained after I chiseled out the tiles.

I had a brief chat with Chuck around lunchtime regarding the refrigerator.  Butch called mid-afternoon to fill me in on why he was not able to answer the phone last night.  Linda called around 2:30 PM to let me know she was leaving the bakery.  She pulled in the driveway an hour later and came in the bus to see what I was up to and let me know it was starting to rain.  I had made good progress but was not done and decided I would keep the power chisel until tomorrow and pay the 1-day (24-hour) rate.

The roofers were aware of the rain, which was very light though increasing steadily, but were in the middle of replacing plywood and installing the skylights.  Some of them finished that up as quickly as they could, cleaned up the roof, and spread out the tarps while the others picked up the debris from the yard and got it in the trash trailer.  The trailer was full so they took it with them when the left at 4:40 PM.

We had a snack of pretzels, green grapes and a small glass of Moscato wine.  My thumbs were both bothering me (arthritis) so I took some Ibuprofen and then went back to work in the bus.  I had to close the roof vents because of the rain so it was warmer inside and a bit stuffy as the humidity had come way up.  I worked as long as I could and quit for the day at 6 PM.

For dinner Linda made a simple green salad and then cooked some whole wheat capellini and tossed it with the homemade tomato-based Marinara sauce she made the other day.  After dinner I worked in my office for a while.  I thought I would upload some blog posts but I had an e-mail from Bus Conversion Magazine with the draft of the May 2015 issue.  I proofread part 2 of my 4-part article on the Exterior Makeover of our bus by Phoenix Paint.  I found one thing that needed to be corrected and e-mailed it to the editor.

Linda got a DVD of Wild from the Howell Library the other day but we were too tired to watch it and just went to bed.  I turned my light out at 9:58 PM, the first time since I can’t remember when that I have done that before 10 o’clock in the evening.